HomeCategory

Bridge

ndaiga bridge
ndaiga bridge
ndaiga bridge

Reconstruction of Ndaiga Bridge on Malaba – Bugiri road. The road is part of the Main international artery to Uganda and its neighboring countries of Rwanda, Burundi and Eastern DRC connection to the Port of Mombasa.

Awoo Bridge
Awoo Bridge
Awoo Bridge

The distance between Lira and Gulu cities, a distance of 130Km via Kamdini junction takes at least three hours due to multiple potholes along the way but through the Awoo Bridge shortcut, travelers save up to 40 minutes of their time.

nalakasi bridge in kaabong
nalakasi bridge in kaabong
nalakasi bridge in kaabong

Detailed topographical surveys, hydrological and hydraulic studies and designs, geotechnical investigations, structural analysis and design of the Nalakasi bridge in Kaabong district of Northern Uganda.

nile bridge jinja
nile bridge jinja
nile bridge jinja

Located 80km east of the business capital Kampala, and 500 meters south of the existing Kampala-Jinja Highway, the project consisted of the construction of a new three span 525m long cable-stayed bridge across the River Nile at Jinja.

Kochi-Bridge
Kochi-Bridge
Kochi-Bridge

The former bridge had a 4 - 6.25-meter span (overall span of 25m), 4.5m width with a narrow dilapidated timber deck with damaged parapets on structural steel universal beams supported on reinforced concrete abutments and reinforced concrete stepped piers.

lopei bridge
lopei bridge
lopei bridge

Lopei Bridge in Napak district, crosses over Lopei swamp along the Moroto – Kotido road linking the districts of Moroto and Kotido through Nakapelimoru Uganda National.

Ora 2 Bridge
Ora 2 Bridge
Ora 2 Bridge

Emergency Design and Build of 4 Strategic Bridges in West Nile Sub-Region: Ora 1, Ora 2, Awa and Olemika on Pakwach – Inde – Ocoko Road.

Osu Bridge
Osu Bridge
Osu Bridge

The former bridge had an 8.25-meter single span, 3.5m width with a narrow and dilapidated timber deck in addition to having no parapets.

Design and construction phases of Ora Bridge located approximately 3km from the Gulu – Arua Road, including a 9.2km upgrade of the gravel approach to the bridge.