CIC’s Relevant Experience

Project Name COUNTRY Name of client, Address Description of work performed Started On Ended On
Consultancy Services for Design Review and Construction Supervision for Selected Infrastructure Sub-projects in Cluster 7 (USMID-AF) UGANDA Hoima City Council / Ministry of Lands, Housing and Urban Development / World Bank Contact Person: Eng. Joseph Nsimbe E-mail: jnsimbe@gmail.com Resident Engineer Mobile: +256 787 727240 The Project involves Design Review & Construction Supervision for the upgrading to Bitumen standard (Asphalt) with provision of mechanically stabilized sub-base, crushed aggregate base, reinstatement of road sides and cross drainage features and Bridges among others. The projects roads within Hoima City include;
  • Perse – Commercial Street – 0.45Km
  • Government Road Extension – 0.46Km
  • Circular Road – 1.0Km
  • Bikunya Road – 0.25Km
  • Tayari – Crown – Eka Road – 0.6Km
  • Tank Hill Road – 0.2Km
  • Sir Tito Mandela – Kasasa Road – 1.27Km
  • November 2021 On-going until May 2023
    Consultancy Services for Design Review and Construction Supervision for Selected Infrastructure Sub-projects in Cluster 7 (USMID-AF) UGANDA Fort portal City / Ministry of Lands, Housing and Urban Development / World Bank Contact Person: Eng. Joseph Nsimbe E-mail: jnsimbe@gmail.com Resident Engineer Mobile: +256 787 727240 The Project involves Design Review & Construction Supervision for the upgrading to Bitumen standard (Asphalt) with provision of mechanically stabilized sub-base, crushed aggregate base, reinstatement of road sides and cross drainage features and Bridges among others. The projects roads within Fort portal City include;
  • Mill Lane – 0.93Km
  • Kahunga Bunyonyi Road – 0.75Km
  • Mugoma Road – 1.0Km
  • Street lighting is to also be done on selected roads and junctions within Fort portal city
  • Mugoma Road – 1.0Km
  • Street lighting is to also be done on selected roads and junctions within Fort portal city
  • November 2021 On-going until May 2023
    Consultancy Services for Design Review and Construction Supervision for Selected Infrastructure Sub-projects in Cluster 7 (USMID-AF) UGANDA Kasese Municipal Council / Ministry of Lands, Housing and Urban Development / World Bank Contact Person: Eng. Joseph Nsimbe E-mail: jnsimbe@gmail.com Resident Engineer Mobile: +256 787 727240 The Project involves Design Review & Construction Supervision for the upgrading to Bitumen standard (Asphalt) with provision of mechanically stabilised sub-base, crushed aggregate base, reinstatement of road sides and cross drainage features and Bridges among others. The projects roads within Kasese Municipality include;
  • Rwenzori Road – 1.35Km
  • Bus Circular Road – 0.45Km
  • Third Street – 0.76Km
  • Kitalikibi Road – 0.42Km
  • Park Rise Road – 0.18Km
  • Stanley Road – 0.43Km
  • Margherita Road – 0.45Km
  • November 2021 On-going until May 2023
    Consultancy Services for Detailed Engineering Design of Selected Bridges under Lot 1; Lot 1:
  • Bubwaya-Mungasa Bridge
  • Nakadidir Swamp Crossing
  • Kitooke Kanangalo Bridge UGANDA
  • Ministry of Works and Transport (MoWT) Contact Person: Eng. Charles Ddungu: durlese@gmail.com Contract Manager, Bridges & Structures Old Port Bell Road, Kampala - Uganda Preparation of detailed designs for Lot 1 Bridges and Swamp Crossing i.e., Bubwaya-Mungasa Bridge, Nakadidir Swamp crossing and Kitooke-Kanangalo Bridge in Uganda. Key activities undertaken include:
  • Undertaking geotechnical, hydrological, and topographical survey and investigations
  • Undertaking preliminary and detailed design for bridge structures and geometric layout of approach roads
  • Performing environmental impact assessment including documentation and reporting
  • Preparation of detailed drawings and specifications that fit within the project budget
  • December 2021 On-going
    Reconstruction of five (5) failed bridges on the national road network under design and build: Lot 3 - Apaa Bridge (12.4 m span) on Amuru – Omee – Rhino Camp Road in Amuru District UGANDA Dynaco Engineering / Uganda National Roads Authority (UNRA) Contact Person: Eng. Sharpe William Tumwine, E-mail: Sharpe.Tumwine@unra.go.ug Manager Bridges & Structures Plot 3-5, New Port Bell Road, UAP Nakawa Business Park Block C & D. P.O. Box 28487 Kampala, Uganda. Mobile: +256 752 988 106 Dynaco Engineering / Uganda National Roads Authority (UNRA) Contact Person: Eng. Sharpe William Tumwine, E-mail: Sharpe.Tumwine@unra.go.ug Manager Bridges & Structures Plot 3-5, New Port Bell Road, UAP Nakawa Business Park Block C & D. P.O. Box 28487 Kampala, Uganda. Mobile: +256 752 988 106 Preparation of detailed designs for Apaa bridge (12.4 m span) Project in Northern Region, Uganda. Key activities undertaken include:
  • Undertaking geotechnical, hydrological and topographical survey and investigations
  • Undertaking preliminary and detailed design for bridge structures and geometric layout of approach roads
  • Performing environmental impact assessment including documentation and reporting
  • Support supervision & monitoring during construction for the Design and Build Contractor
  • Preparation of detailed drawings and specifications that fit within the project budget
  • June 2022. On-going
    Consultancy Services for Design and Build of 3 Strategic Bridges in West-Nile Sub-Region; Lot 6:
  • Kochi on Keri-Midigo-Kerwa Road
  • Osu on Arua-Biliafe-Otrevu Road
  • Odrua on Arua-Vurra-Goli Road
    UGANDA
  • Dynaco Engineering / Uganda National Roads Authority (UNRA) Contact Person: Eng. Sharpe William Tumwine, E-mail: Sharpe.Tumwine@unra.go.ug Manager Bridges & Structures Plot 3-5, New Port Bell Road, UAP Nakawa Business Park Block C & D. P.O. Box 28487 Kampala, Uganda. Mobile: +256 752 988 106 Preparation of detailed designs for Kochi (40 m span), Osu (20 m span) and Odrua (11 m span) bridges in West Nile Region, Uganda. Key activities undertaken include:
  • Undertaking geotechnical, hydrological, and topographical survey and investigations
  • Undertaking preliminary and detailed design for bridge structures and geometric layout of approach roads
  • Performing environmental impact assessment including documentation and reporting
  • Support supervision & monitoring during construction for the Design and Build Contractor Preparation of detailed drawings and specifications that fit within the project budget IMG-20230205-WA0043
  • September 2021 On-going
    Consultancy Services for Rehabilitation of Katungulu Bridge (60m Overall Span) UGANDA Dynaco Engineering / Uganda National Roads Authority (UNRA) Contact Person: Eng. Sharpe William Tumwine, E-mail: Sharpe.Tumwine@unra.go.ug Manager Bridges & Structures Plot 3-5, New Port Bell Road, UAP Nakawa Business Park Block C & D. P.O. Box 28487 Kampala, Uganda. Mobile: +256 752 988 106 Rehabilitation and Detailed design preparation for Katun gulu Bridge which consists of 18m auxiliary spans and a 42m truss bridge. Key activities undertaken include:
  • Undertaking geotechnical, hydrological, and topographical survey and investigations
  • Undertaking preliminary and detailed assessment of the bridge deck and geometric layout of approach roads
  • Determining the possible remedies of the structural components of the bridge especially the bridge deck gvcx
  • April 2021 November 2021
    Consultancy Services for Design of Bibia - Nyimur Road (41Km), Unyama Bridge *30m) and Limu Bridge (20m) UGANDA Kark Technical Services / Dynaco Engineering Limited / Uganda National Roads Authority (UNRA) Construction Supervision and preparation of detailed designs for Unyama Bridge (30 m span), and Limu Bridge (20 m span), along the Bibia – Nyimur Road in Northern Uganda. Key activities undertaken include:
  • Undertaking geotechnical, hydrological, and topographical survey and investigations
  • Undertaking preliminary and detailed design for bridge structures and geometric layout of approach roads
  • Performing environmental impact assessment including documentation and reporting
  • Support supervision & monitoring during construction for the Design and Build Contractor
  • Preparation of detailed drawings and specifications that fit within the project budget
  • Consultancy Services for Preparation of Expressway Development Master Plan (EDMP) for Uganda UGANDA Uganda National Roads Authority (UNRA) / Korea Expressway Corporation (KEC) / Kyong Dong Engineering Company Limited (KDEC) Contact Person: Eng. Edward Byaruhanga email: edward.byarunhanga@unra.go.ug Manager, Transport Planning Plot 3-5, New Port Bell Road, UAP Nakawa Business Park Block C & D. P.O. Box 28487 Kampala, Uganda. Preparation of an expressway development master plan (EDMP) that would gradually cover the country on new alignments commencing with the highest trafficked sections of the primary national road network near Kampala. All this is to be done by;
  • Identifying the transportation requirements and developing an expressway transportation system plan for goods and people;
  • Developing conceptual servicing requirements;
  • Developing an EDMP for Uganda detailing key corridors to be expanded into multilane limited access highways to trigger economic development; and
  • Providing a Strategic Framework and prioritized Investment Plan for Expressway Development. mapgh
  • April 2019 March 2022