Odrua Bridge

Design and construction of Odrua Bridge (11m span) along the Arua – Vurra – Custom – Paidha – Goli Road in West Nile sub-Region, Uganda.

About the Project:

Conduction of preliminary and detailed Topographical, Hydrological, Geotechnical and ESIA Studies and Investigations to determine the required configuration (span and height) of the new bridge, ascertain the optimal location of the new bridge size while minimizing possible negative impacts on the environment.

Structural modeling, analysis and design reinforced of concrete substructures and composite superstructure (reinforced concrete deck on structural steel girders) for the 11m span Odrua Bridge.

 

Lot 6 – Design and Build of 3 Strategic Bridges in West Nile Sub-Region; Kochi on Keri – Midigo – Kerwa Road, Osu on Arua – Biliafe – Otrevu Road and Odrua on Arua – Vurra – Custom – Paidha – Goli Road.
Location:
Arua – Vurra – Custom – Paidha – Goli Road
District:
ARUA DISTRICT
Bridge Form:
Steel – Concrete Composite Bridge
Span:
11m
Project Design Year:
2021