Ora 1 Bridge

Emergency Design and Build of 4 Strategic Bridges in West Nile Sub-Region: Ora 1, Ora 2, Awa and Olemika on Pakwach – Inde – Ocoko Road.

About the Project:

Preliminary and detailed Topographical, Hydrological, Geotechnical and ESIA Studies and Investigations to determine the required configuration (span and height) of the new bridge, ascertain the optimal location of the new bridge size while minimizing possible negative impacts on the environment.

Structural modeling, analysis and design reinforced of concrete substructures and composite superstructure (reinforced concrete deck on structural steel girders) for the new 40m (20m×2) span for Ora 1 Bridge founded on 54No. reinforced concrete piles, 11m span Olemika Bridge, multi-cellular reinforced concrete box culverts for Awa and a double cell (4×3) reinforced concrete box culvert structure for Ora 2.

 

 

Design and Build of Strategic Bridges in West Nile Sub-Region
Location:
Pakwach – Inde -Ocoko Road
District:
West Nile Sub-Region
Bridge Form:
Steel – Concrete Composite Bridge
Span:
2x20m (Overall length: 40m)
Project Design Year:
2019