Apaa Bridge

Design and construction of Apaa Bridge (30m span) to carry the Amuru – Omee – Rhino Camp Road over the Apaa River in West Nile in West Nile sub-Region, Uganda, including 2 km of gravel approach roads.

About the Project:

Design: Detailed topographical surveys, hydrological and hydraulic studies and designs, geotechnical investigations, structural analysis and design of the bridge.

Construction: River diversions, excavations, earthworks and construction of bridge elements in reinforced concrete and structural steel as designed while adhering to the QHSSE requirements of the project.

Key Quantities

  • 952 cu.m Reinforced concrete for bridge works
  • 39,719 cu.m Excavations, earthworks and pavement layers of natural gravel materials
  • 100 m Guardrails
  • 922 cu.m Gabion works
Lot 3: Reconstruction of Failed Bridges on the National Road Network under Design and Build; Apaa Bridge on Amuru – Omee – Rhino Camp Road in Amuru District.
Location:
Amuru – Omee – Rhino Camp Road
District:
AMURU DISTRICT
Bridge Form:
Steel – Concrete Composite Bridge
Span:
20m
Project Design Year:
2019