At the very start of January 2015, the Bugiri – Malaba highway was closed to heavy trucks after Ndaiga Bridge along River Malaba developed The New Jinja Bridge (also known as Second Nile Bridge) is built across Nile River connecting the town of Njeru to Jinja, which is part of International Trunk Road (east-west direction) of Kampala (Capital) – Jinja-Malaba (Kenya border) for land-locked Uganda.
The bridge is the region’s first stay cable bridge and will complement the existing Nalubaale Bridge (Owen Falls Dam), which was built in 1954 located 750m downstream.
Work we performed
• Site Supervision
• Execution of necessary design revisions
• Review of contractor’s work plans, schedule and proposals
• Monitoring contractor’s progress and construction activities
• Supervision of quality of works
• Supervision of quality of materials
• Preparation of monthly progress reports
Design and build of Ndaiga bridge on Tororo – Bigiri highway on the northern corridor.
- Location:
- Bugiri - Malaba Road
- District:
- JINJA DISTRICT
- Bridge Form:
- Steel – Concrete Composite Bridge
- Span:
- Overall span length 525m
- Project Duration:
- 2014 - 2018