Design and Build of Civil Works for Construction of Strategic Bridges in Karamoja Sub-Region; Lot 3 – Lopei Bridge on Moroto – Kotido Road.
Design Scope:
Preliminary and detailed Topographical, Hydrological, Geotechnical and ESIA Studies and Investigations to determine the required configuration (span and height) of the new bridge, ascertain the optimal location of the new bridge size while minimizing possible negative impacts on the environment. Structural modeling, analysis and design reinforced of multi-cellular reinforced concrete box culverts distributed along the Lopei floodplain.

Project Details
- Category: Completed
- Client: UNRA
- Location: Moroto – Kotido Road
- Completed Date: 2019